
This is a picture showing the total foundation in place

This is the track area of the building - it is on the right
hand side of the building as you come in the driveway.

Notice the Existing dirt is lower than the wall height - this
will all be filled with clay to allow the track to be at finished
floor height inside the building.

Here is a view showing the poured walls and piers resting on
the footer.

This is where the track area will be inside the building